Note générale :
Project 797047 is a DPW project number. See also project [5067].
Note sur la mention de responsabilité :
Items 1-18: seal of J.S. Yamashita.
Items 19-22: Wolfrom Muzyk & Partners. Consulting Structural engineers. Winnipeg, MB.
Items 23-39: Scouten, Mitchell, Sigurdson. Consulting engineers. Winnipeg, MB.
Items 40-56: A.E.B. Engineering Group. Consulting electrical engineers. Winnipeg, MB.
Données mathématiques sur les documents :
Scales differ.
Note structurée de contenu :
Items 1-18: Architectural set.
1. Drawing index [Cover page]
2. Drawing A01. Notes and Designations
3. Drawing A02. Keynotes
4. Drawing AR1. Reference drawing. Basement floor plan Mainfloor plan
5. Drawing AR2. Reference drawing. Second floor plan, Roof plan
6. Drawing A1.1. Partial basement plan - Area 1
7. Drawing A1.2. Reflected ceiling plan - Area 1
8. Drawing A2.1. Partial basement plan - Area 2
9. Drawing A2.2. Reflected ceiling plan - Area 2
10. Drawing A3.1. Partial basement plan - Area 3
11. Drawing A3.2. Reflected ceiling plan - Area 3
12. Drawing A4.1. Partial plans - Area 4
13. Drawing A4.2. Reflected ceiling plan - Area 4
14. Drawing A5.1. Control tower & existing roof plan - Area 5
15. Drawing A5.2. Tower plans - Area 5
16. Drawing A5.3. Control cab plans - Area 5
17. Drawing A5.4. Control tower & portable offices elevations - Area 5
18. Drawing A5.5. Sections - Area 5
Items 19-22: Structural set:
19. Drawing S5.1. Existing roof plan
20. Drawing S5.2. Control tower - Floor & roof framing plans
21. Drawing S5.3. Control tower- Elevations & details
22. Drawing S5.4. Control cab - Sections & details
Items 23-39: Mechanical set.
23. Drawing M1.1. Partial basement plan - Area 1 - H.V.A.C.
24. Drawing M1.2. Partial basement plan - Area 1 - Sprinklers
25. Drawing M2.1. Partial basement plan - Area 2 - Plumbing
26. Drawing M2.2. Partial basement plan - Area 2 - H.V.A.C.
27. Drawing M2.3. Partial basement plan - Area 2 - Sprinklers
28. Drawing M3.1. Partial basement plan - Area 3 - Plumbing
29. Drawing M3.2. Partial basement plan - Area 3 - H.V.A.C.
30. Drawing M3.3. Fan room 167B and sections - H.V.A.C.
31. Drawing M3.4. Partial basement plan - Area 3 - Sprinklers
32. Drawing M4.1. Partial plans - Area 4 - H.V.A.C.
33. Drawing M4.2. Partial plans - Area 4 - Sprinklers
34. Drawing M5.1. Control tower & existing troof plan - Area 5 - Plumbing
35. Drawing M5.2. Tower plans - Area 5 - Plumbing
36. Drawing M5.3. Control cab plans - Area 5 - Plumbing
37. Drawing M5.4. Control tower & existing troof plan - Area 5 - H.V.A.C.
38. Drawing M5.5. Tower plans - Area 5 - H.V.A.C.
39. Drawing M5.6. Control cab plans - Area 5 - H.V.A.C.
Items 40-56: Electrical set.
40. Drawing E1.1. Reflected ceiling plan - Area 1 - Lighting
41. Drawing E1.2. Partial basement plan - Area 1 - Power and systems
42. Drawing E2.1. Reflected ceiling plan - Area 2 - Lighting
43. Drawing E2.2. Partial basement plan - Area 2 - Power and systems
44. Drawing E3.1. Reflected ceiling plan - Area 3 - Lighting
45. Drawing E3.2. Partial basement plan - Area 3 - Power and systems
46. Drawing E4.1. Reflected ceiling plan - Area 4- Lighting
47. Drawing E4.2. Partial basement plan - Area 4 - Power and systems
48. Drawing E5.1. Control tower & existing troof plan - Area 5 - Lighting
49. Drawing E5.2. Control tower & existing troof plan - Area 5 - Power & systems
50. Drawing E5.3. Tower plans - Area 5 - Electrical
51. Drawing E5.4. Control cab plans - Area 5 - Electrical
52. Drawing E6.2. Distribution and Communication system riser diagrams
53. Drawing E6.1. Panelboard schedules
54. Drawing E6.3. Riser diagrams and ground node details
55. Drawing E6.4. Electrical details.
56. Drawing E6.5. Luminaire & motor schedules
Items 57-76: Cab.
57. Drawing ALT 1B. [Cab section]
58. Drawing ALT 1A. [Cab section]
59. Section at cab
60. Drawing ALT 2. [Cab section]
61. Drawing ALT 3. [Cab section]
62. Section 3 [cab]
63. Section 2 [cab]
64. [Sketch. Cab plan]
65. Drawing 2. Section console V.D.U.
66. Drawing 1. Section console V.D.U.
67. Drawing 3. Section console V.D.U.
68. [Section console V.D.U.]
69. [Cab plan]
70. Section thru maintenace ring @ dumbwaiter
71. Plan - Dumbwaiter @ ring LVL
72. Drawing A4.2. Building section 3N
73. Section thru maintenace ring @ dumbwaiter
74. Plan Console
75. [Cab section]
76. [Cab Plan]