227. Drawing 5/6. Elevations.
228. Drawing A1. Door and finish schedule. Borehole data.
229. Drawing A2. Basement floor plan, details.
230. Drawing A3. Ground floor and site plan [combined].
231. Drawing A4. Typical floor plan.
232. Drawing A5. Roof plan, penthouse section, details land window elevations.
233. Drawing A6. West and south elevations.
234. Drawing A7. East and north elevations.
235. Drawing A8. Longitudal and cross section.
236. Drawing A9. Wall sections and balcony details.
237. Drawing A10. Stairs 1 and 2.
238. Drawing 6929-E-1. 4KV Transformer vault. (Rev. 1.)
239. Drawing 6929-E-2. One line diagram, electrical. (Rev. 2.)
240. Drawing 6929-E-3. Basement floor electrical.
241. Drawing 6929-E-4. Ground floor, electrical.
242. Drawing 6929-E-5. Typical floor, electrical.
243. Drawing 6929-E-6. Roof & mechanical RM's. (Rev. 1.)
244. Drawing 6929-E-7. Auxiliary Systems. Electrical. (Rev. 2.)
245. Drawing 230-1. Plot plan.
246. Drawing 230-2. Basement floor plan.
247. Drawing 230-3. Ground floor plan.
248. Drawing 230-6. Roof and mechanical room floor plan.
249. Drawing S1. Foundation Plan.
250. Drawing S2. Ground floor.
251. Drawing S3. Typical floor.
252. Drawing S4. Roof plan.
253. Drawing S5. General details.
254. Drawing S6. Wall elevations.
255. Drawing S7. Wall elevations.
256. Drawing S8. Wall elevations.
257. Drawing S9. Wall elevations.
258. Drawing 103. Site development plan.
259. Drawing 6929-E-1. Site Plan.
260. Drawing 6929-E-2. 4KV. Transformer vault.
261. Drawing 6929-E-3. One line Diagram.
262. Drawing 6929-E-4. Basement floor.
263. Drawing 6929-E-5. Ground floor.
264. Drawing 6929-E-6. Typical floor.
265. Drawing 6929-E-7. Roof and mechanical room.
266. Drawing 6929-E-8. Auxiliary System.
267. Drawing 230-1. Plot plan.
268. Drawing 230-2. Basement plan, plumbing, heating, ventilation.
269. Drawing 230-3. Ground floor, plumbing, heating, ventilation.
270. Drawing 230-4. Typical floor, plumbing, heating, ventilation.
271. Drawing 230-5. 10th floor plan, plumbing, heating, ventilation.
272. Drawing 230-6. Roof and mechanical room, room floor plan, plumbing, heating, ventialtion.
273. Drawing 230-7. Heating riser diagram and boiler room schematic.
274. Drawing 230-8. Riser diagrams.
275. Drawing A1. Door and finish schedule.
276. Drawing A2. Ground floor plan, parking lot E.
277. Drawing A3. Revised floor plan.
278. Drawing A3. Basement plan.
279. Drawing A4. Revised typical floor plan.
280. Drawing A4. Typical floor plan.
281. Drawing A5. Penthouse floor plan and section. Dropped ceiling plan, 10th floor.
282. Drawing A6. Elevations.
283. Drawing A7. Elevations.
284. Drawing A8. Sections.
285. Drawing A9. Wall Sections.
286. Drawing A10. Stairs 1 and 2.
287. Drawing A11. Window elevations and details.
288. Drawing A12. Kitchen and bathrooms, plans and elevations.
289. Drawing A13. Entrance lobby plan, elevations, details.
290. Drawing S1. Basement sprinklers.
291. Drawing S1. Foundation.
292. Drawing S2. Column schedule.
293. Drawing S3. Ground floor.
294. Drawing S4. Typical floor roof and penthouse.
295. Drawing S5. Wall Sections.
296. Drawing S6. Shear walls [plans].
297. Drawing S7. Shear walls [elevations].