1. Plot plan. 1960
2. Plot plan. 1959
3. Side elevation west. 1946
Structural
4. Drawing S1. Excavation plan. 1960
5. Drawing S2. Foundations. 1960
6. Drawing S3. Foundation sections. 1960
7. Drawing S4. Foundation wall elevations. 1960
8. Drawing S5. Basement walls sections. 1960
9. Drawing S6. Sub-basement plan. 1960
10. Drawing S7. Basement floor. 1960
11. Drawing S8. Basement floor. Beam & slab schedules. 1960
12. Drawing S9. First floor. 1960
13. Drawing S10. First floor. Schedules & details. 1960
14. Drawing S10 A. First floor. Schedules. 1960
15. Drawing S11. Second floor. 1960
16. Drawing S12. Second floor. Beam & slab schedules. 1960
17. Drawing S13. Third floor. 1960
18. Drawing S14. Fourth floor. 1960
19. Drawing S15. Fourth floor. Beam & slab schedules. 1960
20. Drawing S16. Typical floor 5th, 8th - 14th. 1960
21. Drawing S17. Typical floor, 8th- 12th. Schedules & details. 1960
22. Drawing S18. 6th floor plan. 1960
23. Drawing S19. 6th floor. Schedules & details. 1960
24. Drawing S20. 7th floor. 1960
25. Drawing S21. 7th floor. Schedules & details. 1960
26. Drawing S22. Penthouse floor. 1960
27. Drawing S23. Penthouse floor. Beam & slab schedules. 1960
28. Drawing S24. 14th floor & boiler house roof plan. 1960
29. Drawing S25. Roof schedules. 1960
30. Drawing S28. Foundation changes due to job conditions. 1960
31. Drawing S29. Footings L.8, F.8 & E.8. 1960
32. Drawing S30. Foundation changes due to job conditions. 1960
33. Drawing S31. Revised column schedule A. 1961
34. Drawing S32. Revised column schedule B. 1961
35. Drawing S33 A. Circular stair between 1st & 2nd floor. 1960
36. Drawing S34. Oil tank foundations. 1960
37. Drawing S35. 4th floor. Elevator beam supports 1961
38. Drawing S36. Platform supports. 6th floor duct space 1961
39. Drawing S37. Bridge layout (between St. James & Shawinigan buildings) 1961
40. Drawing S38. 14th floor & boilerhouse roof plan 1961
41. Drawing S39. R.C. slab over walk-in refrigerators 1961
42. Drawing S40. Additional steel beams to support stone at 2nd, 3rd 7 4th floors 1961
43. Drawing S41. Plan of supports at 5th floor to penthouse in duct spaces 1961
Shop drawings
44. Drawing D5. Sub-basement plan 1960
45. Drawing D9. Basement floor 1960
46. Drawing D10. Basement floor 1960
47. Drawing D11. Basement floor. Slab schedule 1960
48. Drawing D22. 1st floor 1960
49. Drawing D23. 1st floor. Schedules & details 1960
50. Drawing D24. 1st floor. Slab 1960
51. Drawing D29. 2nd floor. 1960
52. Drawing D30. 2nd floor.Beam & slab schedule 1960
53. Drawing D34. 3rd floor. 1960
54. Drawing D34 A. 3rd floor. Beams 1960
55. Drawing D35. 3rd floor.Beam & slab schedules 1960
56. Drawing D-60. 4th floor. 1961
57. Drawing D-61. 4th floor. 1961
58. Drawing D-66. Typical floor 5th & 8th - 12th 1961
59. Drawing D-67. Typical floor 5th & 8th - 12th. Schedules & details 1960
60. Drawing D71. 6th floor plan 1961
61. Drawing D72. 6th floor. Schedules & details 1961
62. Drawing D73. 7th floor. 1961
63. Drawing D74. 7th floor. Schedules & details 1961
64. Drawing D77. Penthouse floor 1961
65. Drawing D87. Penthouse. Beam &? Slab schedules 1961
66. Drawing D-81. 14th floor. P/H roof & boilerhouse roof plan 1961
67. Drawing D-82. 14th floor. P/H roof & elevator machine room & roof 1961
68. Drawing D-83. Penthouse roof & 14th floor beam schedules 1961
69. Drawing D-84. Boilerhouse, elevator machine & transformer rooms roof 1961
70. Drawing F1. Foundations
71. Drawing F2. Foundations sections
72. Basement floor. Beam BB-10 1960
73. Sketch 1. Footing schedule
74. Sketch 2. [Sump pit details]
75. Sketch X. suggesting shoring arrangement
76. Typical convector layout