1. Drawing 1.01. Plot plan. 1954
2. Drawing 2.00 A. Basement plan of north block. 1954
3. Drawing 2.01 B. Basement plan. 1954
4. Drawing 2.02 A. First floor plan. 1954
5. Drawing 2.03 A. First floor plan of south block & section F-F. 1954
6. Drawing 2.04 A. Second floor plan of north block & roof plan. 1954
7. Drawing 2.05 A. Second floor plan of south block & north elevation. 1954
8. Drawing 2.06 A. Third floor plan of south block, sections D-D & E-E. 1954
9. Drawing 2.07 A. East, west & south elevations. 1954
10. Drawing 2.08 A. Sections A-A, B-B & C-C. 1954
11. Drawing 2.09 A. Key plan & finish schedule of basement. 1954
12. Drawing 2.10 A. Key plan & finish schedule of first floor. 1954
13. Drawing 2.11 A. Key plan & finish schedule of second floor. 1954
14. Drawing 2.12 A. Key plan & finish schedule of third floor. Stair schedule. 1954
15. Drawing 2.13 A. Door & borrowed light schedules, interior door, base & saddle details. 1954
16. Drawing 2.14 B. Key plan & finish shedule of basement. 1954
17. Drawing 2.15 B. Key plan & finish schedule of first floor. 1954
18. Drawing 2.16 B. Key plan & finish schedule of second floor. 1954
19. Drawing 2.17 B. Key plan & finish schedule of third floor. Stair schedule. 1954
20. Drawing 2.18 B. Basement plan of north block & laboratory equipment details. 1955
21. Drawing 2.19 A. Basement plan of south block. 1955
22. Drawing 2.20. First floor plan of north block & laboratory equipment. Details. 1955
23. Drawing 2.21 A. First floor plan of south block & section F-F. 1955
24. Drawing 2.22 A. Second floor plan of north block & roof plan. 1955
25. Drawing 2.23. Second floor plan of south block & north elevation. 1955
26. Drawing 2.24 A. Third floor plan of south block, sections D-D & E-E. 1955
27. Drawing 3.01 A. Wall sections 1-6. 1954
28. Drawing 3.02 A. Wall sections 7-11. 1954
29. Drawing 3.03 A. Wall sections 9-15. 1954
30. Drawing 3.04. Stair details. 1954
31. Drawing 3.05 A. Window details. 1954
32. Drawing 3.06 A. Window details. 1954
33. Drawing 3.07. Main entrance & vestibule door details. 1954
34. Drawing 3.08 A. Secondary entrance & vestibule door details. 1954
35. Drawing 3.09 A. Washroom, locker & metal rack details. 1954
36. Drawing 3.10. Gymnasium details. 1954
37. Drawing 3.11 A. Workshop area & technical drawing rm. details. 1954
38. Drawing 3.12 A. Biology & science rms. details. 1954
39. Drawing 3.13 A. Home economics & administration area details. 1954
40. Drawing 3.14 A. Library & commercial details. 1954
41. Drawing 3.15 A. Art rm & class rm. details. 1954
42. Drawing 3.16. Misc. cabinet work details. 1954
43. Drawing 3.17. Typical corridor roof access doors & librarian desk details. 1954
44. Drawing 3.18. Detail of steps, entr. to vestibule 126. 1955
45. Drawing 3.21. Detail of entrance rm. 182. Exterior sections. 1955
46. Drawing 3.22. Chimney detail. 1955
47. Drawing 3.23. Sections at chimney. 1955
48. Drawing 3.24 B. Detail of stair 4. 1955
49. Drawing 3.25. Detail of stair 9. 1955
50. Drawing 3.26. Detail of stair 3. 1955
51. Drawing 3.27. Detail of floor at projection rm. 191 & coat rm. 192. 1955
52. Drawing 3.28 A. Wall section 9. 1955
53. Drawing 3.29. Detail of stair 10 & washrooms 186 & 187. 1955
54. Drawing 3.30. Projected brickwork plan of school. 1955
55. Drawing 3.31 B. Detail of conditions at convector cabinet type A. 1959
56. Drawing 3.32 A. Details of stair 8. 1955
57. Drawing 3.33. Details of lime stone seat. 1955
58. Drawing 3.34. Detail of cornice & window sill. 1955
59. Drawing 3.35. Detail of pressed steel door frames. 1955
60. Drawing 3.36. Detail of stair 18. 1955
61. Drawing 3.37. Openings for fans in roof. 1955
62. Drawing 3.38. Section at interior partitions. 1955
63. Drawing 3.39. Detail of partition between rm. 1 & 21. 1955
64. Drawing 3.40. Holes for ducts G12-G13. 1955
65. Drawing 3.41. Frame for spray booth exhaust fan. 1955
66. Drawing 3.42 A. Detail of cornice at roof over gymnasium. 1955
67. Drawing 3.43. Detail of louvres.
68. Drawing 3.44 A. Detail of typical plywood window jambs. 1956
69. Drawing 3.45. Detail of ceiling in visual education. 1956
70. Drawing 3.46. Detail of stairs 16 & 17. 1956
71. Drawing 3.47. Section at typical partition. 1956
72. Drawing 3.48. Location of parts in projection rm. 1956
73. Drawing 3.49. Detail of dado in garbage storage. 1956
74. Drawing 3.50. Detail of display cabinet in corridor. 1956
75. Drawing 3.51. Detail of display cabinet in foyer. 1956
76. Drawing 3.52. Detail of display cabinet in corridor. 1956
77. Drawing 3.53. Details of accordion doors.
78. Drawing 3.54. Detail of junction at dadoes. 1956
79. Drawing 3.55. Detail of recesses for fire extinguishers. 1956
80. Drawing 3.56. Detail of P.A. box in gymnasium. 1956
81. Drawing 3.57. Detail of condition for collapsible gates in corridor. 1956
82. Drawing 3.58. Detail of recesses for collapsible gates in corridor. 1956
83. Drawing 3.59. Detail of recesses for collapsible gates in corridor. 1956
84. Drawing 3.60. Detail of recesses for collapsible gates in corridor. 1956
85. Drawing 3.61. Revised wood railing at stairs. 1956
86. Drawing 3.62. Detail of curtain valence. 1956
87. Drawing 3.63 B. Detail of catwalks. 1956
88. Drawing 3.64. Details at visual education. 1956
89. Drawing 3.66. Partition between toilets & urinal bank. 1956
90. Drawing 3.67. Details of kitchen. 1956
91. Drawing 3.68. Detail of floor inlaid plan of school in foyer. 1956
92. Drawing 3.69. Details of display cabinet in corridor. 1956
93. Drawing 3.70. Detail of pass thru in kitchen. 1956
94. Drawing 3.71. Revisions to wall in administration wing. 1959
95. Drawing 3.72. Detail of coping on wall at front entrance. 1959
96. Drawing 4.01 A. Sections & foundation plan north block. Schedule of footings. 1954
97. Drawing 4.02 A. Foundation plan, south block. 1954
98. Drawing 4.03 A. Framing plan of first floor & sections, south block. 1954
99. Drawing 4.04 A. Bleachers. 1955
100. Drawing 4.05. Bleachers. 1955
101. Drawing 13.01 B. Framing plan of first floor. Pier & base plate schedules. 1954
102. Drawing 13.02. Framing plan of second floors. 1954
103. Drawing 13.03. Framing plan of third floor. Bottom chord of trusses. 1954
104. Drawing 13.04. Framing plan of roof. 1954
105. Drawing 13.05 A. Roof openings at fans & hoods. 1955
106. Drawing 13.06. Location of anemostats & lighting fixtures in music room. 1955
107. Drawing 13.07. Roof openings at fans & hoods.
108. Drawing 13.08. Openings for fans. 1955
109. Drawing 13.09. Openings in 2nd & 3rd floor slabs.
110. Drawing 20-N-00. Basement floor north block. Plumbing. 1954
111. Drawing 20-S-00. Basement floor south block. Plumbing. 1954
112. Drawing 21-N-00. Basement floor north block. Heating & ventilation. 1954
113. Drawing 21-N-01. First floor north block. Mechanical. 1954
114. Drawing 21-N-02. Second floor north block. Mechanical. 1954
115. Drawing 21-S-00. Basement floor south block. Heating & ventilation. 1954
116. Drawing 21-S-01. First floor south block. Mechanical. 1954
117. Drawing 21-S-02. Second floor south block. Mechanical. 1954
118. Drawing 21-S-03. Third floor south block. Mechanical. 1954
119. Drawing 22-N-00. Basement floor north block. Electrical. 1954
120. Drawing 22-N-01. First floor. floor north block. Electrical. 1954
121. Drawing 22-N-02. Second floor floor north block. Electrical. 1954
122. Drawing 22-S-00. Basement floor south block. 1954
123. Drawing 22-S-01. First floor floor south block. 1954
124. Drawing 22-S-02. Second floor floor south block. 1954
125. Drawing 22-S-03. Third floor floor south block. 1954