vol. 1607, folder 8. [Reduced size copies of perspectives]. [Includes letter from RAIC explaining why submission did not qualify, project information sheet and 5 pages of card with colour prints.]
Items transferred with accession 1998-01665-X
1. [Location plan]
2. Alternative 1. Proposed road alternative
3. Site survey for University of Manitoba Earth Sciences building
4. Site survey for University of Manitoba Earth Sciences building
5. Site survey for University of Manitoba Earth Sciences building
6. Building site and road alternate A & B
7. IKOY Scheme
8. Scheme 1
9. Scheme 2
10. Scheme 3
11. Site plan N
12. Site plan M-1A
13. Site plan M-2
14. Site plan M-1
15. [Site plan]
16. Road alternate A
17. Drawing 1. North east sector, Fort Garry Campus plan, The University of Manitoba
18. Site plan N
19. Scheme 1 [Site plan N]
20. Scheme 2 [Site plan N]
21. Scheme 3 [Site plan N]
22. IKOY Scheme [Site plan N]
23. Scheme 4 [Site plan N]
24. Site plan M-1A
25. IKOY Scheme [Site plan M-1A]
26. Scheme 3 [Site plan M-1A]
27. Scheme 4 [Site plan M-1A]
28. Site plan M-2
29. IKOY Scheme [Site plan M-1A]
30. Scheme 3 [Site plan M-1A]
31. Scheme 4 [Site plan M-1A]
32. Proposed parking lot revision
33. Building site & road alternate A & B1
34. Ground floor
35. Second floor.
36. Third floor.
37. Section.
38. [Wall sections]
39. Interior elevation, corridor section
40. South elevation, section
41. [Perspective, interior]
42-43. [Perspective, exterior]
44. Elevation A
45-46. [Sketches. Elevations, interior]
47. Installation sequence
48-50. [Sketches. Elevations, interior]
51. [Sketch. Floor plan]
52. [Elevation, interior]
53. [Sketch. Elevation, interior]
54. [Elevation, interior]
55-58. [Floor plans]
59. Limestone exter. Wall
60. [Ceiling]
61-62. Drawing A7.3 and overlay. [Ceiling]
63. [Ceiling]
64. [Axonometric detail of part of structure]
65. [Sketch. Guardrail]
66. Typical guardrail post
67. [Elevation, interior]
68. [Floor plan]
69. [Roadway, profile]
70. Stone wall type 2
71. Drawing SK14. Stone base layout
72-74. [Floor plans]
75-76. Unnumbered drawing and overlay. Level 200 floor openings
77. Level 300 floor opngs
78-80. Unnumbered drawing and overlays. [Floor plan]
81. CIS Layout - Equipment layout - Plan level 100
82. [Floor plan]
83. [Sewer location, one single line. Overlay for unidentified item]
84. Methodology process
85, 85A. Unnumbered drawing and overlay. [Landscaping]
86. Drawing C1.2. Site plan.
88. Drawing C1.3. Site grading plan.
87. Drawing A1.0. Project data sheet
88, 89, 89A-89C. Unnumbered drawing and overlays. [Level 200]
90, 91A-91B. Drawing A.20 and overlays. [Level 100]
92. Drawing C1.0. Demolition - Site plan
93-94. Drawing A2.1 and overlays. Plan level 200
95-96. Drawing A2.2. [Level 200]
97-103. Drawing A2 and overlays. [Level 400]
104-106. Unnumbered drawing and overlays [Level 300]
107. Drawing A2.1. Level 200 Museum and lounge furniture
108. Drawing A2.4. [Roof]
109. Drawing A2.4. [Roof]
110. Drawing A2.4. Plan roof level
111. Drawing A2.4. [Roof]
112, 112A-112B. Drawing A3.1 and overlays. Elevations.
113, 113A-113F. Drawing A3.2 and overlays. Large scale elevation curtain wall
114, 114A-114F. Drawing A3.3 and overlays. [Elevations]
115, 115A-115B. Drawing A3.6 and overlays. [Building sections]
116, 116A-116B. Drawing A3.7 and overlays. Building sections
117, 117A-117D. Drawing A4.0 and overlays. Wall section.
118, 118A-118E. Drawing A4.0 and overlays. Wall sections.
119, 119A-119E. Drawing A4.3 and overlays. Wall sections.
120, 120A-120E. Drawing A4.4 and overlays. Wall sections.
121, 121A-121C. Drawing A4 and overlays. Wall sections.
122. [Shading. Overlay for unidentified item]
123, 123A-123E. Drawing A4.7 and overlays. [Wall sections]
124, 124A. Drawing A4.8 and overlay. [Details]
125, 125A. Drawing A4.9 and overlay. [Details]
126, 126A. Drawing A4.10 and overlay. [Details]
127, 127A. Drawing A4.11 and overlay. [Details]
128, 128A. Drawing A4.12 and overlay. [Details]
129, 129A. Drawing A4.13 and overlay. [Details]
130, 130A. Drawing A4.14 and overlay. [Details]
131, 131A. Drawing A4.15 and overlay. [Details]
132, 132A. Drawing A4.16 and overlay. [Details]
133, 133A. Drawing A4.17 and overlay. [Details]
134, 134A-134B. Drawing A4.18 and overlays. [Large scale details]
135, 135A-135B. Drawing A4.19 and overlays. Large scale details.
136, 136A, 137. Drawing A4.20 and overlays. [Details]
138, 138A-138B. Drawing A4.21 and overlays. [Large scale details]
139, 139A-139B. Drawing A4.22 and overlays. Large scale details.
140, 140A. Drawing A4.23 and overlay. [Details]
141. Drawing A4.24. [Details]
142, 142A-142B. Drawing A5.1 and overlays. Interior partition details
143, 143A. Drawing A5.3 and overlay. [Interior glass partition details]
144, 144A. Drawing A6.0 and overlay. Steel ladders plan & details
145, 145A-145B. Drawing A6.1 and overlays. [Stair plans details]
146, 146A-146B. Drawing A6.2 and overlays. Stair plans & details.
147, 147A-147B. Drawing A6.3 and overlays. Stair plans / Elevator shaft / details
148, 148A-148B. Drawing A6.4 and overlays. Plaza plan north & details
149, 149A-149D. Drawing A6.5 and overlays. Plaza plan south & partial elevation
150, 150A-150D. Drawing A6.7 and overlays. [Steel stair plan & elevation]
151, 151A-151B. Drawing A7.0 and overlays. Level 100 reflected ceiling plan
152, 152A-152E. Drawing A7.1 and overlays. Level 100 reflected ceiling plan
153, 153A-153F. Drawing A7.2 and overlays. Level 300 reflected ceiling plan
154, 154A-154G. Drawing A7.3 and overlays. Level 400 reflected ceiling plan
155, 155A-155D. Drawing A8.00 and overlays. Tunnel plan
156, 156A-156D. Drawing A8.0 and overlays. Tunnel plan
157, 157A-157B. Drawing A8.7 and overlays. Stone work plaza plans
158, 158A-158C. Drawing A8.8 and overlays. Stone work base details
159, 159A-159C. Drawing A8.9 and overlays. [Exterior bollard frames & details]
160, 160a-1650b. Drawing A8.10 and overlays. Miscellaneous metal work
161, 161A-161H. Drawing FA9.1 and overlays. Equipment layout plan - Level 200
162, 162A-162H. Drawing FA9.2 and overlays. Equipment layout plan - Level 200
163, 163A-163H. Drawing FA9.3 and overlays. Equipment layout plan - Level 300
164, 164A-164H. Drawing FA9.4 and overlays. Equipment layout plan - Level 300
165, 165A-165H. Drawing FA9.5 and overlays. Equipment layout plan - Level 300
166, 166A-166I. Drawing FA9.6 and overlays. Equipment layout plan - Level 400
167, 167A-167I. Drawing FA9.7 and overlays. Equipment layout plan - Level 400
168. Section thru 100 seat Theaters
169, 169A. Unnumbered drawing and overlay. [Lecture theater]
170, 170A. Unnumbered drawing and overlay. [Details]
171, 171A-171B. Unnumbered drawing and overlays. [Tier layout 200 seat lecture theater]
172, 172A-172D. Drawing A9.12 and overlays. [Lecture theater]
173, 173A-173F. Drawing A9.13 and overlays. Lecture theater - 100 seat - Lounge & museum
174, 174A-174D. Drawing FA9.13 and overlays. Lab equipment plans
175, 175A-175B. Drawing FA9.14 and overlays. Office area plan
176. Renovations to Parker building level 100
177. Renovations to Parker building level 200
178. [Details]
179. Drawing A2.2. Level 300 Museum and lounge furiture
180. Drawing M2. Earth sciences building museum furniture
181. Drawing M3. Earth sciences building furniture item F-5
182. Drawing A1.0. Project data sheet
183. Drawing C1.1. Site survey
184. Drawing C1.2. Site plan.
185. Drawing C1.3. Site grading plan.
186. Drawing A2.0. Plan level 100
187. Drawing A2.1. Plan level 200
188. Drawing A2.1. Plan level 200
189. Drawing A2.2. Plan level 300
190. Drawing A2.3. Plan level 400
191. Drawing A2.3. Plan level 400
192. Drawing A2.4. Plan roof level
193. Drawing A2.4. Plan roof level
194. Drawing A3.1. Elevations.
195. Drawing A3.2. Large scale elevation. Curtain wall
196. Drawing A3.3. Large scale elevation.
197. Drawing A3.5. Building sections
198. Drawing A3.6. Building sections
199. Drawing A3.7. Building sections
200. Drawing A4.0. Wall sections.
201. Drawing A4.0. Wall sections.
202. Drawing A4.1. Wall sections.
203. Drawing A4.2. Wall sections.
204. Drawing CA4.4. Wall sections. Color schedules.
205. Drawing A4.3. Wall sections.
206. Drawing A4.4. Wall sections.
207. Drawing A4.5. Wall sections.
208. Drawing A4.6. Wall sections.
209. Drawing A4.7. Wall sections.
210. Drawing A4.8. Large scale details.
211. Drawing A4.9. Large scale details.
212. Drawing A4.13. Large scale details.
213. Drawing A4.14. Large scale details.
214. Drawing A4.16. Large scale details.
215. Drawing A4.18. Large scale details.
216. Drawing A4.19. Large scale details.
217. Drawing A4.20. Large scale details.
218. Drawing A4.22. Large scale details.
219. Drawing A6.0. Steel ladders plan & details
220. Drawing A6.1. Stair plans details.
221. Drawing A6.1. Stair plans details.
222. Drawing A6.2. Stair plans details.
223. Drawing A6.2. Stair plans details.
224. Drawing A6.3. Stair plans / Elevator shaft / Details
225. Drawing A6.5. Plaza plan south & partial elevation
226. Drawing A6.7. Steel stair plan & elevation
227. Drawing A6.8. Steel stair details
228. Drawing A6.9. Steel stair plan & section.
229. Drawing A6.10. Steel stair plan & section.
230. Drawing A7.0. Level 100 reflected ceiling plan
231. Drawing A7.1. Level 200 reflected ceiling plan
232. Drawing A7.2. Level 300 reflected ceiling plan
233. Drawing A7.3. Level 400 reflected ceiling plan
234. Drawing A8.0. Tunnel plan
235. Drawing A8.1. Tunnel section & details
236. Drawing A8.2. Washroom elevation & details.
237. Drawing A8.6. Stone work base layout
238. Drawing A8.7. Stone work plaza plans
239. Drawing A8.8. Stone work base details
240. Drawing A8.9. Exterior bollard frames & details
241. Drawing A9.1. Lab equipment plan
242. Drawing A9.2. Lab equipment plan
243. Drawing A9.3. Lab equipment plan
244. Drawing A9.4. Lab equipment plan
245. Drawing A9.5. Lab equipment plan
246. Drawing A9.6. Lab equipment plan
247. Drawing A9.7. Lab equipment plan
248. Drawing A9.12a. Tier layout 200 seat lecture theatre
249. Drawing A9.12b. Tier layout 200 seat lecture theatre
250. Drawing A9.13a. Lecture theatre - 100 seat lounge & museum
251. Drawing A9.13a. Lab equipment plans
252. Drawing A9.14. Office area plan
253. Drawing PB1. Renovations to Parker building - Plan level 100
254. Drawing PB2. Renovations to Parker building - Plan level 200
255. Drawing PB3. [Renovations to Parker building]
Items transferred with accession 2003-02507-3
1-2. Drawing A4-25 and overlay. Large scale details
3-4. Drawing A4-26 and overlay. Large scale details
7-8. Drawing A5-4 and overlay. Interior elevations Lecture Theatres [lettering]
5-6. Drawing A4-30 and overlay. Large scale details [lettering]
9. Drawing [A9-13A]. Reflected ceiling plan.
10. [Walls. Lettering. Overlay for unidentified item]
11-12. Drawing FA2.2 and overlay. Plan level 300
13-14. Drawing FA2.3 and overlay. Plan level 400
15-18. Drawing [C1.2] and overlays. Site plan
19-20. Unnumbered drawing and overlay. Site plan
21-22. Drawing A8.1 and overlay. Tunnel section & details
23-24. Drawing A8.2 and overlay. Washroom elevations & details
25-27. Drawing A8.4 and overlays. Washroom details
28-29. Drawing A8.11 and overlay. Tunnel details [lettering]