Note générale :
This project was awarded the 1982, Governor General's Medal for Architecture.
Project number [0005], which appears on container labels, is an artificial number assigned by the archivist in the early stages of processing.
Note sur la mention de responsabilité :
Item 1: Canadian Corporation for the 1967 World Exposition Department of Installations.
Items 37-48: [seals of] S.H. Osaka & J.S. Yamashita
Items 60-64: A.E Burstein, Consulting electrical engineers, Winnipeg, MB.
Items 66-67: Dunbar, Paterson, Rose & Associates, Winnipeg, MB.
Item 69: A.E Burstein, Consulting electrical engineers, Winnipeg, MB.
Items 77-88: Pilkington contract division.
Items 89-92: Dominion Bronze Ltd. Winnipeg, MB.
Items 93-103: Con-Force, Winnipeg. MB.
Items 127-132: Design Profile Ltd., Interior Design consultants, Winnipeg, MB.
Item 1: Flower & Beattie Manitoba Land Surveyors.
Items 9-10: Boge, Boge Consulting engineers, Winnipeg, MB.
Données mathématiques sur les documents :
Scales differ
Note structurée de contenu :
Items 1-132: Transferred with accession 1998-01665-X
1. Sketch shewing survey of Lot 234, block 2, plan 129. 1976
2. IKOY office schematic drawing of mezzanine floor plan
3. IKOY office schematic drawing of main floor plan .
4. [Ground floor plan].
5-6. [Floor plan].
7, 7A, 8-16. [Sections]
17. Yellow stair carried thru a mezzanine visable @ night.
18-19. [Elevation].
20. North, south curtain wall elevations. 1977
Items 21-26. Office renovation (1974) for IKOY Partnership. 1974
21. Demolition plan.
22. Floor plan section.
23. [Floor plan]. n.d.
24. Isometric of desk & layout table
25. Electrical layout.
26. Portable dwg wagon.
27. Drawing 1. Site plan. n.d.
28. Drawing 2. River side n.d.
29. Drawing 3. Street side n.d.
30. Drawing 4. Main floor. n.d.
31. Drawing 5. Second floor. n.d.
32. Drawing 6. Mezzanine. n.d.
33. Drawing 7. Street elevation n.d.
34. Mezzanine. n.d.
35. Second floor. n.d.
36. Main floor. n.d.
37. Drawing A1. Site plan. 1978
38. Drawing A2. Main floor plan. 1978
39. Drawing A2 A. Main floor plan. 1978
40. Drawing A3. Second floor plan. 1978
41. Drawing A4. Mezzanine floor plan. 1978
42. Drawing A5. Elevations. 1978
43. Drawing A6. Building sectrions 1978
44. Drawing A7. Wall sections. 1978
45. Drawing A8. Interior elevations & details 1978
46. Drawing A9. Additional rebar to mezzanine floor plan 1978
47. Drawing A10. Ceiling grid 1978
48. Drawing A11. Steam, shower, change room layout & details 1978
49. Front & rear stair 1978
50. Rental space elev. General office 1978
51. Main floor rental space 1978
52. Int. Stair @ mezzanine 1978
53. Deck details fence details 1978
54. Mezzanine floor plan telephone locations 1978
55. Main floor plan telephone locations 1978
56. Mechanical, electrical layout upper floor 1978
57. Drawing P1. Main floor plan [plumbing] 1978
58. Drawing P2. Second floor plan [plumbing] 1978
59. Drawing P3. Mezzanine floor plan [plumbing] 1978
60. Drawing E1. Mechanical/Electrical layout upper floor 1978
61. Drawing E1. Mechanical/Electrical layout upper floor 1978
62. Drawing E2. Electrical mezzanine floor plan 1978
63. Drawing E3. Electrical second floor plan 1978
64. Drawing E4. Electrical main floor plan 1978
65. Existing landscaping 1978
66. Planting plan details 1978
67. Drawing PA1. Plant schedule 1978
68. Main floor [missing] Paint schedule 1978
69. Electrical [missing] Main [missing] 1978
70. Second floor paint [missing] 1978
71. Drawing PA3. Mezzanine Floor plan paint schedule 1978
72. Furniture layout 1978
73. Lighting & power layout mechanical 1978
74. Pool deck extension 1979
75. Drawing S1. Foundation plan. 1978
76. Drawing S2. Wind bracing frame. 1978
77. Drawing 1 of 6. Main floor office glazing doors 1978
78. Drawing 2 of 6. 2nd floor office glazing doors. 1978
79. Drawing 3 of 6. Glass wall elevations 1978
80. Drawing 4 of 6. Partial 2nd floor elevations 1978
81. Drawing 5 of 6. Glass wall office details 1978
82. Drawing 6 of 6. Glass office wall details 1978
83. Drawing 1 of 6. Main floor office glazing doors 1978
84. Drawing 2 of 6. 2nd floor office glazing doors 1978
85. Drawing 3 of 6. Glass wall elevations 1978
86. Drawing 4 of 6. partial 2nd floor elevations 1978
87. Drawing 5 of 6. Glass wall office details 1978
88. Drawing 6 of 6. Glass office wall details 1978
89. Drawing 1778-06 2 of 6. Details
90. Drawing 1778-06 3 of 6. Details
91. Drawing 1778-06 4 of 6. Details
92. Drawing 1778-06 5 of 6. Details
Items 93-103: Electrical, 1977
93. Drawing E1. East & west elevations
94. Drawing E3. Second floor plan.
95. Drawing E2. Ground floor H.C. layout
96. Drawing E4. Roof plan.
97. Drawing 124-1. 36" double tees MK C1
98. Drawing 125-1. 10 1/2" insulated wall panel MK D1
99. Drawing 125-2. 10 1/2" insulated wall panel MK D2
100. Drawing 125-3. 10 1/2" insulated wall panel MK D3
101. Drawing 125-4. 10 1/2" insulated wall panel MK D4
102. Drawing 125-5. 10 1/2" insulated wall panel MK D5
103. Drawing 125-6. 10 1/2" insulated wall panel MK D6
Items 104-126: [1978 construction]
104. Rough grading
105. [telephone]
106. Main floor [missing] leasehold [missing]
107. Office renovation
108. Drawing A2. Main floor plan leasehold improvements
109. Drawing A1. Site plan.
110. Drawing A2. Main floor plan.
111. Second floor plan.
112. Drawing A3. Second floor plan.
113. Drawing A4. Mezzanine floor plan.
114. Mezzanine floor plan.
115. Drawing A5. Elevations.
116. Drawing A6. Building sections
117. Drawing A7. Wall sections.
118. Drawing A8. Interior elevations & details
119. Drawing A10. Ceiling grid
120. Drawing A11. Steam et.
121. Drawing M2. [Untitled]
122. Drawing 1. [Untitled]
123. Drawing 2. [Untitled]
124. Drawing 3. [Untitled]
125. [Sketch. Floor plan]
126. Sketch
Items 137-132: [1994 construction]
127. Drawing A1. Main floor plan.
128. Drawing A1. Main floor plan.
129. Drawing A2. 2nd floor plan
130. Drawing A1. Main floor plan.
131. Drawing A2. 2nd floor plan
132. Drawing A1. Main floor plan.
Items transfered with accession 2003-02507-3
1. Drawing A-1097. Sketch shewing survey of lot 234, block 2, plan 129 1976
2. Drawing A1. Site plan. 1978
3. Drawing A2. Main floor plan. 1978
4. Drawing A3. Second floor plan. 1978
5. Drawing A4. Mezzanine floor plan. 1978
6. Drawing A5. Elevations. 1978
7. Drawing A6. Building sections 1978
8. Drawing A7. Wall sections. 1978
9. Drawing S1. Foundation plan. 1978
10. Drawing S2. Wind bracing frame. 1978
11. Drawing P1. Site services. 1978
12. Drawing P2. Main floor plan plumbing 1978
13. Drawing P3. Second floor plan plumbing 1990
14. Drawing A4. Mezzanine floor plan. Plumbing 1978
15. Drawing A1. Site plan. 1978