1. Drawing 416. Pin solenoid brake [Cont. 8581]
2. Drawing 418. Brake [Cont. 8581]
3. Limit switch enclosure - hinged cover
4. Drawing 10. Revised counterweight
5. 110 Induction motor W.R. type
6. Lower casing [Cont. 8581]
7. Drawing B-26. South approach [Cont. 8795]
8. Hand release [Cont. 8581]
9. Drawing 24. Name plate [Cont. 8581]
10. Drawing E6. Hinged cover limit switch enclosure
11. Drawing SK P369. Outline of enclosed distribution panels
12. Drawing Sk P357. Outline of controllers
13. Plan of piers 1 to 15
14. Drawing P1121. Indicator board in sheet steel case
15. Drawing D-29410. Assembly. hand release for solenoid brake
16. Drawing B788. Controller for lock motor (case removed)
17. Drawing B787. Controller for main motor (case removed)
18. [i]13-gear shift (ii) packing plates (iii) clutch, shift shoe, retaining ring and shift arm, and (iv) bushings [Cont. 8581]
19. Drawing E35. Revised sketch details showing connection between steel and timber structures - south approach [Cont. 8795]
20. Drawing E34. Bracket for north end of 150' span [Cont. 8795]
21. (i) pinion shaft & shift rod (ii) 16-cover plate (iii) detail of 4 jaw clutch, and (iv) cap screws, plug, oil gauge and grease clip [Cont. 8795]
22. Drawing E6. Limit switch, enclosure & chain drive
23. Drawing D52. Adjustable drum type limit switch
24. Drawing H-1187. Drum controller
25. Drawing H-1203. Reversing master controller. 1 point drum
26. Bevel gear reversing unit
27. 1 & 3 upper and lower casing
28. Drawing 7-K-L. Shifter strap
29. Bevel gear revering limit. Revisions
30. (i) capscrews, plug, oil gauge, grease cup (ii) pinion shaft and shift rod (iii) cover plate [Cont. 8581]
31. Upper and lower casing. Revisions
32. Name plate [Cont. 8581]
33. Drawing E10. Key map showing location [Cont. 8585]
34. General plan of bridge
35. General plan of bridge
36. Drawing B27. Connection 150' steel span and timber trestle. South approach [Cont. 8795]
37. Method of affixing walk-way
38. Drawing 220. 4 cylinder 5 1/2" x 7" type "CM" industrial engine"
39. Span
40. Section of ground on centre line of bridge (south side)
41. Drawing D28. General plan of south approach: also general layout of highway trestle
42. Drawing D24. Plan of steel span and sectional elecation
43. Erection of bascule span
44. Plan V-126. Proposed highway and railroad bridge for Lynn Creek
45. Plan V-125. Proposed highway and railroad bridge for Lynn Creek
46. Plan V-153. Lynn Creek crossing
47. Plan to accompany application for running right son C.P.R. mainline from Lapointe Pier to 2nd Narrows bridge
48. [Situational & general plan of bridge]
49. End view