[On account of the huge numbers of drawings, several groupings of drawings are proposed in the list below]
1. Elevation 123'-10".
2. [Plan.]
3. [West wing plan.]
4. [North wing plan.]
5. East wing plan.
6. South wing plan.
7--20. [Basement plans]
21--31. [25th floor plans]
32--42. [26th floor plans]
43--54. [27th floor plans]
55--62. [28th floor plans]
63--75. [29th floor plans]
76--87. [30th floor plans]
88--99. [31st floor plans]
100--113. [32nd floor plans]
114. Details of entrance door from corridor (north wing 27th floor).
115. Details of sliding glass doors to elevator lobbies.
116. Revised details of rail support above elevator lobby door.
117. Wood furring in false ceiling.
118. Revised track detail for Fairhurst doors.
119. Amendment to core's toilets floor 25 - 32 (typical).
120. Details for floor & ceiling screen supports in waiting areas.
121. Hole - diagram for bars supporting screens in core. Floors 25 - 27.
122. Hole - diagram for bars supporting screens in core. Floors 28 - 30.
123. Hole - diagram for bars supporting screens in core. Floors 31 & 32.
124. Additional block furring around exposed pneu. tube loop 24/N.
125. Details of floor locks for security doors (25th - 32nd floors).
126. Interior finish & interior door schedule, 25N & 25E.
127. Interior finish & interior door schedule, 25S & 25W.
128. Interior finish & interior door schedule, 26N & 26E.
129. Interior finish & interior door schedule, 26S & 26W.
130. Interior finish & interior door schedule, 27N & 27W.
131. Interior finish & interior door schedule, 27S & 27W.
132. Interior finish & interior door schedule, 28N & 28E.
133. Interior finish & interior door schedule, 28S & 28W.
134. Interior finish & interior door schedule, 29N & 29E.
135. Interior finish & interior door schedule, 29S & 29W.
136. Revision to metal partition system for 32 fl/E.
137. Revision to metal partition system for 31 fl/N.
138. Interior finish & finish door schedule, 30N & 30E.
139. Interior finish & finish door schedule, 30S & 30W.
140. Interior finish & finish door schedule, 31N & 31E.
141. Interior finish & finish door schedule, 31S & 31E.
142. Interior finish & finish door schedule, 32N & 32E.
143. Interior finish & finish door schedule, 32S & 32W.
144. Colour schedule for ceramic tile applications.
145. Typical pattern for all resilient tile floors.
146. Details of bulletin boards.
147. Counter details for rms. 25/E/64 & 25/E/62.
148. Ceiling bracket detail for rail in X-ray rm. 25/E.
149. Ceiling plan, 25th floor.
150. Ceiling plan, 26th floor.
151. Ceiling plan, 27th floor.
152. Ceiling plan, 28th floor.
153. Revision to 28/S ceiling plan.
154. Ceiling plan, 29th floor.
155. [Sketch filed with 2.84A.]
156. Revision to 29/N ceiling plan.
157. Ceiling plan, 30th floor.
158. Ceiling plan, 31st floor.
159. Ceiling plan, 32nd floor.
160. Revision of telephone positions.
161. Proposed Revised pull-opening for misc. drawers & counter doors.
162. Headroom under beams - first basement.
163. Part plan 26th floor west wing.
164. Location of door lettering.
165. Detail of bulletin boards.
166. Portion of 1st basement.
167. Plan of 1st basement, east wing.
168. Washroom layout in 1st basement.
169. Preliminary layout for I.B.M. fiduciaries rm. in 30th floor.
170. Plan of record-centre 26th floor -east wing.
171. Proposed layout for card A type rm. 26th floor - east wing.
172. Proposed layout for G.E.D. vault & print rm.
173. Proposed layout for X-ray rm. 25th floor - east wing.
174. Preliminary plan of I.B.M. tabulating & computer rms. 26th floor -west wing.
175. Layout of locker rms.
176. Appendix 1, sheet 1 to proposals for demountable partitions.
177. Appendix 1, sheet. 2
178. Typical units for storage walls.
179. Typical elevator door frame details.
180. I.B.M. rm. 31st floor -north wing.
181. Proposed layout of print -rm. 27th floor -core.
182. Detail of display panels.
183. Plan & elevations of metallurgical laboratory 28th floor -east wing.
184. Filler-panel details. Sheet 1.
185. Filler-panel details. Sheet 2.
186. Locker rms. -layout 29th - 32nd floors.
187. Locker rms. -layout 25th - 28th floors.
188. Quantity of aluminum letters & numbers.
189. Proposed furring around pneu. tube loop on 24th floor north.
190. Revisions to metal cabinets & partitions -32nd floor.
191. Revisions to metal partitions -27th floor -west wing.
192. Installation for ceiling -diffusers on alcan floors (core).
193. Revision to metal partitions in rm. 31/W/55.
194. Alterations to metal partitions.
195. Revisions to metal partitions 28/W.
196. 26th floor -plan of west wing.
197. Revision to metal partitions 30th floor - north wing.
198. Revisions A, B & C to metal partitions on 26/N.
199. Revision to metal partition system 32/S.
200. Revision to metal partition system 29/W.
201. Revision to metal partition system 28/S.
202. Revision to metal partition system 31/N.
203. Mail depot counter details.
204. Metal partition for library 29/E/50.
205. Details of counter & tables.
206. Details of rib spacing in typical Hauserman partition panel.
207. Speaker cabinet.
208. Misc. counter & shelf details for 32nd floor.
209. Workcounter & print -folding tables.
210. Two counters in mail rm. first basement.
211. Details for T.V. units.
212. Sheet metal cap for fire door slots.
213. Revision to metal partitions in rms. 28/N/14 & 32/W/13.
214. Shelves for chemical containers in rm. 27/N/56.
215. 24 Hour clocks in basement rm. 16.
216. Elevation from stair #10.
217. Alternations to existing vanity counters.
218. Revised entrance door to library on 31/E.
219. Shelves for ladies wash & locker rms.
220. New furring for telephone cables in rm. 19, first basement.
221. Alterations to auditorium & projection rm.
222. Plan of reflected ceiling, part 31st floor -east wing.
223. Alterations to salad preparation table.
224. Geocoustic block layout, details in rm. 19 - basement.
225. Hook for women's washrooms.
226. Alteration to washroom 32/S/47.
227. Proposed location of folding doors in lunchroom 25/N.268. 228--273. [Floor layouts]
274--398. [Mechanical drawings]
399. Holes in beams (25/E, 27/N).
400. Holes in beams (26/W, 30/E, 31/N).
401. Holes in beams (29/E, 31/E).
402. Holes in beams (30/W, 32/S).
403. Air conditioning layout 31/E.
404. Alcan ductwork to Catheart building.
405. Details of exhaust & cooling requirements for emerg. diesel.
406. Remote radiator mounting details, 2nd basement.
407. Steam pipe to Alcan Area, elevation 101'-0".
408. Detail of vending machine cold water supply.
409. Air distribution schedule.
410. Part plan of basement.
411. Metallurgical laboratory 28/E.
412. Plumbing drawing schedule.
413. Alternative piping arrangements for induction units.
414. Floor partition 26/W.
415. Detail of diesel generator rm.
416. Proposed relocation of plumbing pipes below beams.
417--506. [Electrical drawings]
507--568. [Underfloor duct layout]
569. Electrical details. 550 V 120-208 V flow diagram.
570. Misc. risers & details.
571. Empty conduit riser for intercome system.
572. Ceiling pattern layout. 31st floor east wing.
573. 25, 26 & 27 floor electrical centre core layout. Underfloor duct revision.
574. Single line diagram for emergency distribution to telegraph relay centre.
575. Location of alcans pull boxes 9th floor.
576. Single line diagram for telegraph relay centre electrical.
577. Diesel generator room arrangement.
578. Electrical conduit risers in pneumatic tube shaft.
579. Detail of cells at wet column.
580. Mechanical & electrical. Basement details.
581. Detail of diesel generator rm. showing location of structural baseplates.
582. Fire alarm system basement elev.
583. Revision to light & power layouts 25th - 32nd floor locking details.
584. Revision to underfloor duct layout for floors #25, 26, 29-31.
585. Tie connection between the Aluminum Co. teletype riser & building telephone closet.
586. Revision to first basement electrical.
587. Part plan of 25th floor east wing X-ray rm. detail.
588. Emergency distribution teletype centre. First base ment electrical.
589. Revision to basement emergency power distribution for teletype centre.
590. Reproduction dept. intercom system. First basement electrical.
591. Revision to mail rms. underfloor duct layout from 25th - 32nd floor.
592. Heaters for reception desk plaza lobby.
593. Revised board rm. lighting layout.
594. Secretariat library 31/E.
595. Lighting layout sketch. 25/Centre core.
596. Cafeteria part plan. [Cafeteria 25/N]
597. Plans & elevations. [Cafeteria 25/N]
598. Sections & details. [Cafeteria 25/N]
599. Sections & details. [Cafeteria 25/N]
600. Details. [Cafeteria 25/N]
601. Refrigeration. 31/E, 25/N. [Cafeteria 25/N]
602. Trucks-gallery 31/E, 25/N. [Cafeteria 25/N]
603. Ventilator 37. [Cafeteria 25/N].
604. Salad preparation table 30.31. [Cafeteria 25/N]
605. Walk in refrigerator & freezer 25 & 26. [Cafeteria 25/N].
606. Alterations to shelving assembly. [Cafeteria 25/N]
607. Alteration & extension to drain pipe on equipent 53. [Cafeteria 25/N]
608. Hot water requirements for dishwashing machine. [Cafeteria 25/N]