Collection search - Hydro-Electric Power Commission of Ontario Construction Views of the Gatineau-Toronto 220-KV Transmission System First Circuit - 1928
-
Record information – Brief Hydro-Electric Power Commission of Ontario Construction Views of the Gatineau-Toronto 220-KV Transmission System First Circuit - 1928
Hierarchical level:Item (Accession level)Date:1928Item number (ISN):129641Type of material:Moving imagesFound in:Archives / Film, Video and Sound -
Record information – Details Fonds/collection:ONTARIO HYDROAccession:1989-0236Media:FilmProduction date:1928Production company:Hydro Electric Power Corporation of OntarioDescription:The Gatineau-Toronto line was started in July 1927 and was completed by September 1928. A map shows the 203 miles in Ontario and 27 miles in Quebec. The line is logged and cleared, towers assembled and erected. Horses are used. The line rolls are pulled in by a tractor and strung. Excavation in Ground Water. Excavations are shored and pumped and footage grillage is installed. Transporting and erecting heavy steel stemplate footings in rough country. Towers are assembled and erected. Tractor "trouble" in softground between tower legs while pulling cable.Language:Silent with English intertitlesOriginal number:053~054~055Notes:Detailed holdings information: -
Ordering and viewing options Conditions of access:OpenConsultation copy number:V1 8906-0016
Reproduction access:no use without the permission of Ontario HydroYou can order materials in advance to be ready for you when you visit. You will need a user card to do this.
Cannot visit us on site? You can purchase a copy to be sent to you. Some restrictions may apply.