Collection search - Saint-Augustin (Pointe A La Truite) Basse Cote Nord Nouvelle Installation Portuaire - Transfert Du Lot De Greve Et En Eau Profonde - Transfert De La Régie Et De L'Administration Du Lot De Terre Ferme - Construction D'Un Quai D'Environ 60 Metres
-
Record information – Brief Saint-Augustin (Pointe A La Truite) Basse Cote Nord Nouvelle Installation Portuaire - Transfert Du Lot De Greve Et En Eau Profonde - Transfert De La Régie Et De L'Administration Du Lot De Terre Ferme - Construction D'Un Quai D'Environ 60 Metres
Hierarchical level:File (Accession level)Date:1988/07/07-1989/12/31Reference:R188, RG13, Box number: 9, File number: HQPRO 4-294109File no. (creator):HQPRO 4-294109BAN no.:2014-01615-1Type of material:Textual materialFound in:Archives / Collections and FondsItem ID number:5815217Context of this record: -
Record information – Details Date(s):1988/07/07-1989/12/31Place of creation:No place, unknown, or undeterminedLanguage of material:EnglishFinding aid no.:Additional information:Source:GovernmentFormer archival reference no.: -
Ordering and viewing options Conditions of access:You can order materials in advance to be ready for you when you visit. You will need a user card to do this.
Cannot visit us on site? You can purchase a copy to be sent to you. Some restrictions may apply.
- Date modified: