1. NMC117994. Drawing 1. Alterations to rm #107. Typical wall section. Door trim n.d.
2. NMC117998. Ground floor plan. n.d.
3. NMC117998. Second floor plan. n.d.
4. Cross section AA. Typical wall section n.d.
5. [Plot plan] n.d.
6. Plot plan n.d.
7. NMC62978. [Plan of floor tiles] n.d.
8. [Plan & elevation of transformer room, switch room & garbage room] n.d.
9. [side walk & floor elevations] n.d.
10. [Side & front elevations] n.d.
11. [Perspective] n.d.
12. [side elevations showing grade] n.d.
13. [Ground floor plan] n.d.
14. Ground floor plan. n.d.
15. Second floor plan. n.d.
16. [Sketch] Second floor plan. n.d.
17. [Sketch] Ground floor plan. n.d.
18. NMC117999. [Plot plan] 1935
19. Proposed addition. Ground floor. Second floor 1955
20. Basement floor plan. 1955
21. Plot plan 1955
22. Drawing 1. Basement floor plan. [Sketch plan #1] 1955-1956
23. Drawing 2. Ground floor plan. [Sketch plan #1] 1955-1956
24. Drawing 3. second floor plan. [Sketch plan #1] 1955-1956
25. Existing basement floor plan showeing electrical & heating. 1955
26. Plot plan showing elevations 1955
27. Ground floor plan. 1957
28. First floor plan. 1957
29. Ground floor plan. 1957
30. [Dide elevation] 1957
31. Drawing 1. Plot plan 1957
32. NMC62973. Drawing 2. Foundation plan 1957
33. NMC62972. Drawing 3. Ground floor plan. Section AA. Steel door frame. Details of trench under washer. Steel stair boiler room - tank room. Detail of doors 1957
34. NMC62971. Drawing 4. First floor plan. Roof plan. Section through typical ventilator. Elevation of S.S Inst cabinet. Detailsof vent ducts from toilets 1957
35. NMC62970. Drawing 5. North, south, east, west elevations 1957
36. Drawing 6. Utility room details. Formula room details. Locker details. 1957
37. NMC62969. Drawing 7. Cross section. Typical wall section. Section through outside wall of main entrance platform. Section AA. Typica section through stairl 1957
38. NMC62968. Drawing 8. Ground floor plan. [Heating] 1957
39. NMC62967. Drawing 9. First floor plan. [Heating] 1957
40. NMC62966. Drawing 10. Boiler room plan & details. [Heating] 1957
41. First floor plan. [Heating] 1957
42. NMC62977. Drawing E1. Ground floor plan. [Electrical] 1957
43. NMC62976. Drawing E2. First floor plan. [Electrical] 1957
44. NMC62975. Drawing E3. Ground floor plan. [Electrical] 1957
45. NMC62974. Drawing E4. First floor plan. [Electrical] 1957
46. Drawing E5. [Partial first floor plan] 1958
47. Detail of electric trench from transformer room to new building 1958
48. Layout laundry equipment only 1958
49. NMC62979. Drawing 4A. Layout & elevations of area adjacent to case room 1958
50. Ground floor plan. 1958
51. Plan showing equipment layout in sub-sterilizer roomm & case room 1958
52. Plan. Est, south, east elevations. Secion AA. Section through roof slab 1958
53. Revised electrical layout for transformer & switch rooms 1958
54. Detail of panelling for proposed chapel 1959
55. Plan [of transformer & switch rooms]. West elevation 1959
56. Vestibule addition to north elevation. Elevations. Sections. Plan. Detail of "A", Detail on Corner." 1959
57. Elevation & section of lockers 1959
58. Ground floor plan. 1959
59. [Ground floor plan] 1959
60. Drawing E3. Second floor plan. [Electrical] 1959
61. NMC117996. Ground floor plan. [Existing layout] 1959
62. NMC117995. Second floor plan. [Existing layout] 1959
63. Partial second floor plan. Details of wood wardrobe for bedrooms 1959
64. Ground floor plan. [Existing layout] 1959 (copy of item 61)
65. Second floor plan. [Existing layout] 1959 (copy of item 62)
66. Partial second floor plan. Details of wood wardrobe for bedrooms 1959 (copy of item 63)
67. Plot plan. Details of supports 1960
68. [Details of switch box] 1961
69. Drawing E1. Basement floor plan. [Electrical] 1961
70. Drawing E2. Ground floor plan. [Electrical] 1961
71. Drawing E3. Second floor plan. [Electrical] 1961