Collection search - Plan of Cross - section of flat dam to be Erected from Victoria Island to Chaudiere Island across the Buchanan Channel. Plan of Bulkhead to be erected across the Buchanan Channel to govern the water for the Hydraulic Lots. Plan of 176 feet of the new line of Bridges to be erected at the Chaudiere Islands as shown on the General map. [architectural drawing]
-
Record information – Brief Plan of Cross - section of flat dam to be Erected from Victoria Island to Chaudiere Island across the Buchanan Channel. Plan of Bulkhead to be erected across the Buchanan Channel to govern the water for the Hydraulic Lots. Plan of 176 feet of the new line of Bridges to be erected at the Chaudiere Islands as shown on the General map. [architectural drawing]
Hierarchical level:ItemDate:n.d.Reference:Local class no.: H2/450/Ottawa/N.D., Box number: 2000226733Local class no.:H2/450/Ottawa/N.D.Type of material:Architectural and technical drawingsFound in:Archives / Collections and FondsItem ID number:4149831Context of this record: -
Record information – Details Date(s):n.d.Place:S.l.:Place of creation:CanadaPublisher:s.n.,Extent:1 map : Manuscript Copy ; 12 1/4 x 34 1/4.Language of material:EnglishAdditional name(s):Additional information:Varying form of title:Source:Private -
Ordering and viewing options Conditions of access:You can order materials in advance to be ready for you when you visit. You will need a user card to do this.
Cannot visit us on site? You can purchase a copy to be sent to you. Some restrictions may apply.