Collection search - Plan of the Union Suspension Bridge, between Bytown and Hull, to be erected across the Ottawa River, below the Chaudiere Falls. C.E. Office of the Board of Works. 1842. Fig. 1. Plan of Road way. Fig. 2. Elevation. Fig. 3. Section though A.B. Fig. 4. Section through center of Stone Arch. Fig. 5. Enlarged Plan of Towers, End View. Side View. Fig. 6. Plan of Base of One Tower. Fig. 7. Stone Arch. [architectural drawing]
-
Record information – Brief Plan of the Union Suspension Bridge, between Bytown and Hull, to be erected across the Ottawa River, below the Chaudiere Falls. C.E. Office of the Board of Works. 1842. Fig. 1. Plan of Road way. Fig. 2. Elevation. Fig. 3. Section though A.B. Fig. 4. Section through center of Stone Arch. Fig. 5. Enlarged Plan of Towers, End View. Side View. Fig. 6. Plan of Base of One Tower. Fig. 7. Stone Arch. [architectural drawing]
Hierarchical level:ItemDate:1842Reference:Local class no.: H2/450/Ottawa/1842 (Union Suspension Bridge), Box number: 2000226747Local class no.:H2/450/Ottawa/1842 (Union Suspension Bridge)Type of material:Architectural and technical drawingsFound in:Archives / Collections and FondsItem ID number:4149828Context of this record: -
Record information – Details Date(s):1842Place:S.l.:Place of creation:CanadaPublisher:s.n.,Extent:1 map : Manuscript Original Coloured ; 25 3/4 x 38 3/4.Language of material:EnglishAdditional name(s):Additional information:Varying form of title:Source:Private -
Ordering and viewing options Conditions of access:Terms of use:You can order materials in advance to be ready for you when you visit. You will need a user card to do this.
Cannot visit us on site? You can purchase a copy to be sent to you. Some restrictions may apply.