Collection search - Tay Canal Survey. Plan no. 2. Shewing amount of rock and gravel excavation required to make the river navigable, from a point 2 1/2 miles east of Perth, to where the proposed deviation to the Rideau Lake leaves the Tay River. Tracing: A. T. Phillips. [cartographic material]