Collection search - Dealing with Ice at Beauharnois
-
Record information – Brief Dealing with Ice at Beauharnois
Hierarchical level:Item (Accession level)Item number (ISN):315365Type of material:Moving imagesFound in:Archives / Film, Video and Sound -
Record information – Details Fonds/collection:DE MOHRENSCHILDT, WalterAccession:1983-0100Media:FilmPart:1 of 1Release date:1960/1969 ?Production company:Le Service technique audiovisuel, Direction relations publiques pour la région Maisonneuve, Hydro-QuébecProduction credit:director/editing, Ernest Bougie; technical director, Pierre Bernard; producer, manager, Roger Boisvert; scenario/narrator, Pat McDougall; animation, Posicom Inc.; photography, F. Gagnon; consultant, Léo RacicotCountry of production:cnDescription:Documentary on the Beauharnois Canal and hydro-electric power development located 40 kilometers west of Montreal, and shared by Hydro-Québec and the St. Lawrence Seaway authorities for power production and shipping. Several operations of its control system are examined including installation of boom cables and an early warning system in the canal; and monitoring of the water flow and ice formatiion in winter. Sequence shows the control room and giant generators at the power plant. <15mn>Language:EnglishNotes:Detailed holdings information: -
Ordering and viewing options Conditions of access:OpenConsultation copy number:V1 8309-0107
Donor restrictions:No donor restrictions.Copyright status:Under copyright.Copyright owner:Copyright owner: Hydro-Quebec.Reproduction access:avec autorisation des ayants-droitYou can order materials in advance to be ready for you when you visit. You will need a user card to do this.
Cannot visit us on site? You can purchase a copy to be sent to you. Some restrictions may apply.